Embankment Stabilisation Works at Ballykeenan

Client: Carlow Co Co

Location: Borris, Co Carlow

Brief Overview:
The project involved the regrading of an existing embankment and stabilisation with a reinforced earth system over 550m.

Key Elements:

  • Traffic Management and Diversions along prime National Roads including construction of temporary diversion bridge
  • Site Clearance works with extensive tree felling required prior to construction works
  • Bulk Excavation of existing embankment to allow for new road realignment and installation of Reinforced Earth system.
  • Processing of existing rock on site for use as suitable back-fill to reinforced earth system
  • Design and Construction of reinforced earth retaining structure over 550m
  • Infiltration trench over 550m
  • Drainage works for bank run off water
  • Extruded kerb and concrete rubbing strip over 550m
  • Installation of 550m of safety barrier
  • Road markings and studs
  • Landscaping